ThyssenKrupp

Overhaul of IT Management in France

Context: Facing performance and organizational challenges within its IT Management Division (DSI) in France, the Thyssen Group enlisted Next2i for a complete takeover of its IT operations.

Solution: Next2i conducted an in-depth analysis of existing processes, identified bottlenecks, and implemented a structural reorganization. We deployed modern tools to optimize IT infrastructure management and supported teams throughout the transition.

Results: A modernized IT division with enhanced performance, fully aligned with Thyssen Group’s strategic objectives. This collaboration enabled Thyssen to gain agility and operational efficiency.

  • client: ThyssenKrupp
  • Location: Systèmes d'Information
  • Surface Area: Multinationale
  • Architect: France

French Handball Federation (FFHB)

French Handball Federation (FFHB) – IT Management and VMware Cluster Integration

Context: The FFHB required outsourced management of its IT infrastructure and a high-performance system to meet its growing needs.

Solution: Next2i took full responsibility for IT management, including preventive, corrective, and scalable maintenance of all IT equipment. We also integrated a VMware cluster to enhance virtualization and optimize resource utilization.

Results: Seamless and proactive IT management, combined with a high-performance infrastructure, allowing the FFHB to focus on its core sporting activities.

  • client: FFHB
  • Location: Sport, Gestion IT
  • Surface Area: Organisation nationale
  • Architect: France

Air France

Air France – Implementation of the VMware Disaster Recovery Plan (DRP)

Context: The Air France Works Council wanted to ensure business continuity through a reliable Disaster Recovery Plan (DRP) based on a VMware solution.

Solution: Next2i designed and deployed a fully virtualized DRP. By leveraging VMware, we enabled real-time data replication and established rapid recovery processes in case of failure.

Results: A resilient infrastructure allowing the Air France Works Council to resume operations within minutes in the event of an incident. This project has strengthened the reliability and security of operations.

  • client: Air France
  • Location: Aviation
  • Surface Area: Multinationale
  • Architect: France

Boticinal

Boticinal – Management of Interconnection Across All Sites

Context: Boticinal, a leading pharmacy network, needed to unify its sites within a coherent network infrastructure to improve communication and centralized data management.

Solution: Next2i designed and deployed a network architecture interconnecting all Boticinal sites. Thanks to a seamless implementation and advanced security measures, each site can now share data in real time.

Results: A robust and scalable infrastructure, ensuring reliable access to information and better coordination between sites. As a result, Boticinal has strengthened its operational efficiency and its ability to quickly respond to customer needs.

  • client: Boticinal
  • Location: Réseau de pharmacies
  • Surface Area: Leader du marché
  • Architect: France

Médecins Sans Frontières

Médecins Sans Frontières – Migration from Windows 7 to Windows 10

Context: Médecins Sans Frontières (MSF) needed to carry out a large-scale migration from the obsolete Windows 7 to Windows 10, minimizing service interruptions for its teams.
Solution: Next2i handled the complete migration, carefully planning each step to ensure application compatibility and providing user training. We also managed the testing phases and provided post-migration support.
Results: A successful migration within the specified timeframe, with zero critical interruptions. MSF teams now benefit from a modernized, secure, and efficient working environment.

  • client: Médecins Sans Frontières
  • Location: Santé humanitaire
  • Surface Area: Plusieurs milliers
  • Architect: International